Sunday, February 12, 2017

started with the locker for the instrument panel

I forgot to take some pictures today but this is what I did in short. Made a bottom of the locker for the instrument panel, sorted all the bolts and nuts to see what I still need, drill the holes for U-bold what will be used for the diagonal wires under the tramps, cut the floor board of the toilet in two and put some putty on the edges and sanded the lower part of the hull.

No comments:

Post a Comment