Friday, May 8, 2015

glued the anchor locker floor in place

I made the anchor locker floor of  the off cut from the beam bulkhead. I am glad that I have a half front bulkhead, it is now so much easier place the floor. Tomorrow I make some flanges on it so I can glue the other half of the front bulkhead. I did cut the front tubes, I have to put some extra carbon around them because the wall thickness need to be a little more. As that is done I can glue the other tubes in to. I also cut the carbon chain plate.

No comments:

Post a Comment